ARASAR INTERNATIONAL — PUBLIC COMPANY EVIDENCE DIRECTORY Updated: 2026-10-28 This directory links to information already published by Arasar. It is not a company qualification certificate, project permit, insurance schedule or client endorsement. Verify documents applicable to your actual contract with the project team. Legal business name: Arasar International Building Demolition LLC Office: Office 212, Detroit House, Dubai Motor City, Dubai, UAE Company phone / WhatsApp: +971 52 527 0635 Office phone: +971 4 575 1871 Email: info@arasarinternational.ae Company facts: https://arasarinternational.ae/company-profile Demolition company capabilities: https://arasarinternational.ae/#expertise UAE project coverage: https://arasarinternational.ae/service-areas Interactive presentation: https://arasarinternational.ae/company-profile-book PUBLISHED ISO CERTIFICATES Published cycle: 21 July 2026 to 20 July 2027. Management-system certificates are distinct from project-specific approvals and completion evidence. ISO 9001:2015 — Quality Management System — CR/SD-26411/01 https://arasarinternational.ae/certifications/arasar-iso-9001-2015.pdf ISO 14001:2015 — Environmental Management System — CR/SD-26411/02 https://arasarinternational.ae/certifications/arasar-iso-14001-2015.pdf ISO 45001:2018 — Occupational Health and Safety Management System — CR/SD-26411/03 https://arasarinternational.ae/certifications/arasar-iso-45001-2018.pdf VILLA RENOVATION & SELECTIVE REMOVAL Dubai Hills Location: Dubai, UAE Published work: Selective villa demolition Recorded client: DMDC Contracting LLC Recorded period: November–December 2025 and December 2025–January 2026 Scope: Selective structural removal within an existing villa renovation rather than unrestricted full-building demolition. Evidence basis: First-party Arasar project record supported by original photography from the Dubai Hills work area. The photographs document work in progress, not a complete before-and-after sequence or a quantified completion report. Scope boundary: These two documented Golf Place, Dubai Hills references concern villa-renovation demolition, not total removal of two villas. Existing Dubai Hills archive photographs are not individually assigned to either contract or presented as dated completion photographs. Project source: https://arasarinternational.ae/projects/dubai-hills-selective-demolition Jumeirah Golf Estates Location: Dubai, UAE Published work: Structural modification Recorded client: Hennessey LLC Recorded period: March 2026 Scope: Controlled separation and removal of selected structural elements as part of a residential modification programme. Evidence basis: First-party Arasar project record supported by original photography of removed sections and handling at the vehicle. These selected work-stage photographs do not establish a project duration, lifted weight or full before-and-after record. Scope boundary: Completed structural-alteration reference. The March 2026 contract record does not date each existing archive photograph or establish complete demolition of the villa. Project source: https://arasarinternational.ae/projects/jumeirah-golf-estates-structural-modification Gardenia Townhomes Location: Wasl Gardenia Townhomes, Jabal Ali First, Dubai, UAE Published work: Villa floor-slab demolition Recorded client: Amana Steel Building Contracting LLC Recorded period: June–July 2026 Scope: Demolition of concrete floor slabs using diamond sawing during a villa renovation, including removal and disposal of demolished concrete and construction debris. Evidence basis: First-party reference supplied by Arasar, recording the client, location, period and delivered work. No unrelated photograph is presented as a photograph of this contract. Scope boundary: Completed villa-renovation slab package. No total-building demolition, undisclosed quantity or future production rate is implied. Project source: https://arasarinternational.ae/projects/gardenia-townhomes-villa-slab-demolition-dubai Palm Jumeirah Location: Palm Jumeirah, Dubai, UAE Published work: Villa slab and column removal Recorded client: Paramount International Contracting LLC Recorded period: September 2026 Scope: Diamond sawing of a reinforced-concrete floor slab and columns, core drilling of lifting holes, and loading and removal of the demolished concrete. Evidence basis: First-party reference supplied by Arasar, recording the client, location, period and delivered work. No unrelated photograph is presented as a photograph of this contract. Scope boundary: Completed selective structural-demolition package. No property address, homeowner identity, full-villa demolition or unsupported lifting weight is published. Project source: https://arasarinternational.ae/projects/palm-jumeirah-villa-structural-demolition FOUNDATIONS & ROAD INFRASTRUCTURE Al Mustaqbal Road Location: Dubai, UAE Published work: Concrete foundation cutting and removal Recorded client: Wade Adams Contracting LLC Recorded period: July 2026 Scope: Demolition of reinforced-concrete foundation slab sections using diamond wire sawing and diamond sawing, segmented for lifting and removal. The package included method-statement and risk-assessment preparation and core drilling of lifting holes. Evidence basis: First-party Arasar project record supported by the completed-project portfolio, original work-area photographs and method illustrations. Publication was authorised in October 2026. The scope is defined foundation-section removal, not demolition of the surrounding road, towers or an entire building. Scope boundary: The volume and one-month duration describe this completed package. They are not standard prices, guaranteed rates or proof of pile-head reduction on this project. Project source: https://arasarinternational.ae/projects/al-mustaqbal-road-foundation-cutting-dubai Al Qudra Road corridor Location: Between Al Qudra Road and Sheikh Zayed Bin Hamdan Road, Dubai, UAE Published work: Concrete manhole demolition Recorded client: Wade Adams Contracting LLC Recorded period: July–August 2026 Scope: Demolition of manholes using diamond sawing and diamond core drilling to prepare elements for lifting and removal. Evidence basis: First-party reference supplied by Arasar, recording the client, location, period and delivered work. No unrelated photograph is presented as a photograph of this contract. Scope boundary: Completed manhole-demolition reference. Archive method footage, where linked, is not independently attributed to these six structures. Project source: https://arasarinternational.ae/projects/al-qudra-manhole-demolition-dubai Deira Location: Deira, Dubai, UAE Published work: Reinforced-concrete barrier removal Recorded client: Wade Adams Contracting LLC Recorded period: August 2026 Scope: Diamond sawing of a reinforced-concrete road barrier, with core-drilled lifting holes and organised handling and relocation of the removed segments. Evidence basis: First-party reference supplied by Arasar, recording the client, location, period and delivered work. No unrelated photograph is presented as a photograph of this contract. Scope boundary: 30+ m means over 30 linear metres, not square metres or cubic metres. This reference concerns a road barrier, not demolition of surrounding buildings. Project source: https://arasarinternational.ae/projects/deira-concrete-road-barrier-demolition Sheikh Zayed Road Location: Sheikh Zayed Road, Dubai, UAE Published work: Reinforced-concrete foundation removal Recorded client: Wade Adams Contracting LLC Recorded period: September 2026 Scope: Diamond sawing of a reinforced-concrete foundation slab, segmented for subsequent lifting and removal, including core drilling of lifting holes. Evidence basis: First-party reference supplied by Arasar, recording the client, location, period and delivered work. No unrelated photograph is presented as a photograph of this contract. Scope boundary: Length and thickness are reported separately. No volume, pile-head work, machine capacity or demolition of surrounding buildings is inferred from these measurements. Project source: https://arasarinternational.ae/projects/sheikh-zayed-road-foundation-demolition VENUES & SPECIALIST FACILITIES Dubai Duty Free Tennis Stadium Location: Dubai, UAE Published work: Operational renovation Recorded client: Hennessey LLC Recorded period: March–May 2026 Scope: Preparation of the method statement and risk assessment; demolition of GRC elements with hand-held tools, concrete columns with HILTI wall saws, and the blockwork parapet around the stadium stands, including lowering of removed elements and site clean-up. Evidence basis: First-party Arasar project record supported by original photography and the company's completed-project portfolio, authorised for publication in October 2026. Quantities describe Arasar's specialist renovation package, not demolition of the stadium. The photographs are work-stage evidence, not proof of event attendance or a full facility handover. Scope boundary: Completed parapet and structural-alteration package. These figures are project totals, not a production-rate promise or a claim that the entire venue was demolished. Project source: https://arasarinternational.ae/projects/dubai-duty-free-tennis-stadium-renovation Khazna Data Centre Location: Abu Dhabi, UAE Published work: Data centre concrete cutting and coring Recorded client: BK Gulf LLC Recorded period: November 2025–September 2026 Scope: Formation and enlargement of service openings during construction of the Khazna Data Centre at Al Mafraq Industrial Area, Abu Dhabi, using diamond sawing and diamond core drilling. Evidence basis: First-party Arasar project record based on the company's completed-project portfolio and original Khazna work-area photographs, authorised for publication in October 2026. This is concrete cutting and coring evidence, not a complete data centre decommissioning, IT removal or facility handover claim. Scope boundary: The coring figure is the recorded project total in metres, not the depth of one bore. Concrete cutting is reported in square metres, not as a floor area cleared. The work does not substantiate complete data centre dismantling or certified data destruction. Project source: https://arasarinternational.ae/projects/khazna-data-centre-concrete-cutting-abu-dhabi NEXT STEP Send the project location, removal limits, drawings and retained-asset requirements to the Arasar team. Request current licence, insurance and authority-eligibility evidence relevant to the proposed contract; this directory does not establish those approvals. https://arasarinternational.ae/company-profile#contractor-enquiry