ARASAR INTERNATIONAL — DEMOLITION CONTRACTOR ENQUIRY BRIEF Version: 24 September 2026 Company: https://arasarinternational.ae/company-profile Service coverage: https://arasarinternational.ae/service-areas Use this briefing sheet to give shortlisted demolition companies the same information. It is a request for information/quotation, not a contract, permit, method statement or engineering approval. Fill unknown items with “to confirm”. Do not put identity documents, access codes or confidential plans in a public post. 1. PROJECT LOCATION Emirate: Dubai / Abu Dhabi / Sharjah / Ajman / Ras Al Khaimah / Fujairah / Umm Al Quwain Area, plot or building name: Relevant municipality, development or facility operator: Owner / authorised representative: Appointed consultant and project contact: 2. WHAT GOES — AND WHAT MUST REMAIN Asset: building / villa / warehouse / industrial plant / office / shop / data centre / pool / foundations / concrete openings / other Complete demolition, partial removal or interior strip-out: Removal limits, approximate quantities and available drawings: Retained structure, shared walls, finishes, assets and live operations: IT or other equipment handover requirements, if applicable: Photos / marked drawing references: 3. SITE CONDITIONS Occupied areas and neighbouring assets: Live services and agreed isolation responsibility: Access widths, floor levels, equipment loads to be assessed and lifting space: Working-hour restrictions, dust/noise constraints and public protection: Material storage, loading and rubble transport routes: Known surveys or information still missing: 4. RESPONSIBILITY AND APPROVALS Who confirms the applicable permit route and contractor eligibility? Who provides structural information and reviews temporary works? Who obtains owner/developer permissions and utility clearances? Who provides the proposed method, risk controls and supervision? Who arranges waste transport, approved destinations and required records? Approval status and dependencies before mobilisation: 5. COMPARE QUOTATIONS ON THE SAME BASIS Ask each bidder to state: - Contracting legal entity and project-specific eligibility evidence. - Comparable references and its actual scope on each project. - Proposed sequence, machinery, supervision and retained-asset protection. - Inclusions, exclusions, provisional quantities and pricing assumptions. - Transport, disposal and any recovery/salvage arrangements. - Start-date dependencies, work sequence and handover condition. - How changed site information or additional work will be agreed in writing. - Commercial terms and completion records for review before appointment. 6. RETURNED PROPOSALS Bidder A / date / unresolved questions: Bidder B / date / unresolved questions: Bidder C / date / unresolved questions: Differences to resolve before comparing final prices: CONTACT ARASAR Dubai-based project team: +971 52 527 0635 (calls and WhatsApp) Email: info@arasarinternational.ae Published office: Office 212, Detroit House, Dubai Motor City, Dubai, UAE Project suitability, local approvals and mobilisation are confirmed per site.