UAE project networkBuilt alongside industry leadersExplore all
UAE recurring project networkRecurring project partners

Companies we repeatedly work alongside across major UAE construction, infrastructure and development programmes.

Wade Adams logoWade Adams
Dutco logoDutco
Binghatti logoBinghatti
China State Construction logoChina State Construction
China Railway Construction logoChina Railway Construction
Al Naboodah logoAl Naboodah
Sobha Constructions logoSobha Constructions
Saudi Binladin Group logoSaudi Binladin Group
Hilalco logoHilalco
Kharafi National logoKharafi National
Ginco logoGinco
Western Bainoona Group logoWestern Bainoona Group
DBB Contracting logoDBB Contracting
Group AMANA logoGroup AMANA
BK Gulf logoBK Gulf
BESIX logoBESIX
ARCO General Contracting logoARCO General Contracting
ISO 9001 · ISO 14001 · ISO 45001Certified management systemsQualityEnvironmentSafety9001 · 14001 · 45001

Verified ISO management systems

Three certifications. One disciplined way of working.

Independent certification covering quality, environmental responsibility and occupational health and safety for Arasar's demolition activities.
Certified scopeWrecking & demolitionCurrent certificate cycle21 Jul 2026 — 20 Jul 2027
Arasar ISO 9001:2015 certificate previewFull certificate

Quality

ISO 9001:2015

Quality Management SystemConsistent, controlled project delivery

Documented processes, quality checks and continual improvement across certified operations.

Certificate
CR/SD-26411/01
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 9001:2015 certification marks
Arasar ISO 14001:2015 certificate previewFull certificate

Environment

ISO 14001:2015

Environmental Management SystemResponsible environmental control

A structured approach to waste, resources and environmental impact during demolition activities.

Certificate
CR/SD-26411/02
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 14001:2015 certification marks
Arasar ISO 45001:2018 certificate previewFull certificate

Health & safety

ISO 45001:2018

Occupational Health and Safety Management SystemSafer people and worksites

Systematic control of occupational risks, site hazards and worker wellbeing.

Certificate
CR/SD-26411/03
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 45001:2018 certification marks

ITMAD and EIAC marks are displayed together, at equal visual weight and without altered proportions, in accordance with the issuer's rules for web use.

Read the certification mark usage guide

Project strategy

Is Demolition in Dubai Cheaper Than Renovation? A Full Comparison Guide

Demolition is not automatically cheaper than renovation, and renovation is not automatically more sustainable. The correct decision depends on structural condition, the future layout, compliance upgrades, programme and the value of what can genuinely be retained.

Selective structural dismantling within a retained buildingTechnical insight · Dubai
01

When renovation can be the stronger option

Retention may reduce structural work and preserve embodied material when the frame is sound and compatible with the future use. Selective demolition and precision cutting can create openings while keeping valuable elements in service.

  • The structure has verified capacity and condition
  • The new use fits existing grids and floor levels
  • Services can be upgraded without disproportionate alteration
  • Occupied phases are practical and commercially acceptable
02

When replacement may offer better value

Extensive corrosion, movement, incompatible geometry or repeated compliance interventions can make retention complex. Full removal may provide a clearer programme and a structure designed directly around the new requirement.

  • Major foundations or structural systems require replacement
  • The desired layout conflicts with load-bearing elements
  • Hazardous materials or hidden defects are widespread
  • Phased renovation would create excessive operational disruption
03

Compare whole-project scenarios

Commission a condition assessment and develop both options far enough to compare temporary works, approvals, design, demolition, construction, programme and risk. Material recovery and future operating performance should be included rather than treating demolition as a single isolated cost.

Project note

Guidance is the starting point. The site determines the method.

Every structure, access route and operating environment is different. Final engineering, approvals and controls should be based on verified project information and a site-specific assessment.

Explore controlled demolition in Dubai and across the UAERequest a technical discussion

From guidance to a site-specific method

Bring us the constraint.

Discuss your project+971 4 575 1871info@arasarinternational.ae