UAE project networkBuilt alongside industry leadersExplore all
UAE recurring project networkRecurring project partners

Companies we repeatedly work alongside across major UAE construction, infrastructure and development programmes.

Wade Adams logoWade Adams
Dutco logoDutco
Binghatti logoBinghatti
China State Construction logoChina State Construction
China Railway Construction logoChina Railway Construction
Al Naboodah logoAl Naboodah
Sobha Constructions logoSobha Constructions
Saudi Binladin Group logoSaudi Binladin Group
Hilalco logoHilalco
Kharafi National logoKharafi National
Ginco logoGinco
Western Bainoona Group logoWestern Bainoona Group
DBB Contracting logoDBB Contracting
Group AMANA logoGroup AMANA
BK Gulf logoBK Gulf
BESIX logoBESIX
ARCO General Contracting logoARCO General Contracting
ISO 9001 · ISO 14001 · ISO 45001Certified management systemsQualityEnvironmentSafety9001 · 14001 · 45001

Verified ISO management systems

Three certifications. One disciplined way of working.

Independent certification covering quality, environmental responsibility and occupational health and safety for Arasar's demolition activities.
Certified scopeWrecking & demolitionCurrent certificate cycle21 Jul 2026 — 20 Jul 2027
Arasar ISO 9001:2015 certificate previewFull certificate

Quality

ISO 9001:2015

Quality Management SystemConsistent, controlled project delivery

Documented processes, quality checks and continual improvement across certified operations.

Certificate
CR/SD-26411/01
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 9001:2015 certification marks
Arasar ISO 14001:2015 certificate previewFull certificate

Environment

ISO 14001:2015

Environmental Management SystemResponsible environmental control

A structured approach to waste, resources and environmental impact during demolition activities.

Certificate
CR/SD-26411/02
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 14001:2015 certification marks
Arasar ISO 45001:2018 certificate previewFull certificate

Health & safety

ISO 45001:2018

Occupational Health and Safety Management SystemSafer people and worksites

Systematic control of occupational risks, site hazards and worker wellbeing.

Certificate
CR/SD-26411/03
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 45001:2018 certification marks

ITMAD and EIAC marks are displayed together, at equal visual weight and without altered proportions, in accordance with the issuer's rules for web use.

Selected work · Dubai and UAE

Demolition and concrete cutting projects in Dubai and the UAE.

Published project records with defined removal scopes, actual locations and attributable evidence.

From the field

The work. As it happens.

Original Arasar photographs and short site clips. Each shows the operation visible in the frame, without assigning an unverified client, contract or quantity.

Concrete panel lifted beside a retained roadside wall at night
Field photographStructural section lifting
Crane rigging and site workers beside the Trade Center St sign at night
Field photographRoadside lifting area
Site workers and lifting equipment in a roadside excavation at night
Field photographNight-shift coordination
Two workers beside wall-saw rails and hoses on a roadside concrete wall
Field photographWall-saw setup
Long concrete wall, saw rail, hoses and crane vehicle in a night work area
Field photographThe cutting corridor
Worker and hoses in a narrow excavated corridor alongside a concrete wall
Field photographAccess along the cut
Site workers, hoses and a truck-mounted crane around an urban excavation
Field photographUrban work area
Two workers using a handheld concrete saw beside a coated concrete chamber
Field photographLocal concrete cutting
Power and support equipment arranged along a work area
Field photographEquipment supporting the cut
Excavator bucket and site workers removing material beside a building
Field photographMechanical material removal
Mobile crane positioned above an open concrete chamber and excavation
Field photographPlanning the lift
Diamond-wire drive and guide pulleys mounted along a concrete chamber edge at night
Field photographDiamond-wire system in place
Four colleagues beside an excavation with mobile cranes in the background
Field photographAt the work area
Field video · no audio · 7sNight-time concrete panel lift

A crane lifts a separated rectangular concrete panel beside a retained roadside wall.

Field video · no audio · 16sThe wall-saw working area

A rail-mounted saw, hoses and the site team are visible along a concrete wall at night.

Field video · no audio · 21sA concrete section lifted clear

A crane hook and slings lift a concrete wall section clear of its surrounding structure.

Field video · no audio · 10sConcrete section release at night

A cut wall section tilts under crane rigging as it separates from the retained concrete.

Field video · no audio · 12sHandheld cutting beside a chamber

Two workers guide a handheld concrete saw at the base of a coated concrete chamber, with water at the cutting area.

Field video · no audio · 8sConcrete chamber cutting setup

The camera looks across an open concrete chamber, showing guide pulleys, cut lines and the surrounding work area.

Field video · no audio · 18sDiamond-wire equipment at the chamber edge

A close view follows the diamond-wire drive wheels, guide pulleys and concrete cut at night.

From the work area

Inside our work areas.

Original site clips show core drilling, wall and wire sawing, parapet removal and concrete-section handling. Location-specific project footage is distinguished from method footage whose exact site is not recorded.

Site video · 14 sec · No audio

Concrete wall cutting at night in Dubai

Arasar site footage showing a rail-mounted saw at the base of a concrete wall during night-time concrete cutting in Dubai.

Site video · 10 sec · No audio

Horizontal core drilling at night

Arasar site footage showing a horizontal core-drilling rig working into a concrete wall at night.

Site video · 21 sec · No audio

Lifting a separated concrete section

Arasar site footage of a crane lifting a separated concrete section clear of a scaffolded residential work area.

Site video · 12 sec · No audio

Track-mounted concrete wall sawing

Arasar site footage showing a track-mounted wall saw and its operator during concrete cutting inside a structure.

Site video · 25 sec · No audio

Handheld parapet demolition at the tennis stadium

Arasar site footage showing handheld-tool work beside the parapet at Dubai Duty Free Tennis Stadium.

Site video · 30 sec · No audio

Lifting a parapet section at the tennis stadium

Arasar site footage of a crane lifting a separated parapet section from the Dubai Duty Free Tennis Stadium work area.

Site video · 6 sec · No audio

Diamond wire-saw guide system in operation

Arasar site footage showing a diamond wire-saw drive and guide pulleys at a concrete work area.

Site video · 8 sec · No audio

Lifting a separated concrete chamber section

Arasar site footage of a crane lifting a large concrete chamber section above an excavation.

Site video · 16 sec · No audio

Concrete chamber cutting setup

Arasar site footage showing cutting equipment and the work area around an exposed concrete access chamber.

Site video · 16 sec · No audio

Horizontal concrete core drilling inside a structure

Arasar site footage showing an operator and team using a horizontal core-drilling rig against an interior concrete wall.

Arasar crew beside a crane truck and removed concrete pieces outside a villa
Site photograph

Concrete removal at a villa

The site team and a crane truck handle removed concrete and masonry sections outside a residential property.

Four Arasar site workers wearing hard hats and high-visibility vests beside interior scaffolding
Site photograph

The team on site

Arasar team members pictured inside a work area, with scaffolding and construction materials alongside them.

Arasar crew on a concrete work area beside an excavated trench at night
Site photograph

Night-shift work area

A night-shift team photograph records the concrete work area, site equipment and the adjacent excavated trench.

Arasar workers guiding a large concrete panel suspended by lifting slings above a truck bed
Site photograph

Handling a removed concrete panel

A concrete panel is handled with lifting slings above a truck bed, with other removed sections already on the vehicle.

A mobile crane lifting a rectangular concrete section above a villa during Arasar works
Site photograph

Lifting a roof section clear

A mobile crane lifts a separated concrete section above the roofline during a residential alteration.

A crane lifting a separated concrete section beside a scaffolded residential property
Site photograph

Lifting a separated villa section

A mobile crane handles a separated concrete section beside a retained residential building and scaffold.

A rail-mounted wall saw fixed to a concrete wall beside circular openings
Site photograph

Wall-saw setup inside a structure

The saw rail, cutting unit and hoses are visible within the concrete work area.

A crane lifting a large concrete chamber section above an excavated work area
Site photograph

Lifting a concrete chamber section

Lifting gear carries a concrete chamber section clear of the excavation. The image documents the lift-out stage.

An exposed concrete chamber with cutting equipment and site workers beside an excavation
Site photograph

Preparing a concrete access chamber

The chamber, access excavation and equipment are shown together during Arasar site work.

Arasar crew and concrete-cutting equipment in a narrow roadside work area
Site photograph

Concrete work beside a road

Equipment, hoses and the crew share the confined work zone beside the roadway.

Arasar team operating a horizontal core-drilling rig against a concrete wall
Site photograph

Horizontal coring inside a structure

The drill stand, horizontal barrel and team are visible inside a high-ceilinged concrete work area.

Additional completed UAE packages

Recorded clients. Defined scopes.

These project references provide the location, period and completed work. Only attributable project photographs are used; reference-only records do not borrow photographs from another site.

Villa floor-slab demolition

Gardenia Townhomes

Arasar completed diamond-sawn concrete floor-slab demolition and debris removal for Amana Steel Building Contracting LLC at Gardenia Townhomes in June–July 2026.

Amana Steel Building Contracting LLC
June–July 2026

Read the project reference

Concrete manhole demolition

Al Qudra Road corridor

Arasar demolished six manholes for Wade Adams Contracting LLC during road construction between Al Qudra Road and Sheikh Zayed Bin Hamdan Road in July–August 2026.

Wade Adams Contracting LLC
July–August 2026

Read the project reference

Reinforced-concrete barrier removal

Deira

Arasar demolished over 30 linear metres of 450 mm thick reinforced-concrete road barrier for Wade Adams Contracting LLC in Deira during August 2026.

Wade Adams Contracting LLC
August 2026

Read the project reference

Villa slab and column removal

Palm Jumeirah

Arasar completed 200 m² of concrete cutting and removed slab and column elements for Paramount International Contracting LLC at a Palm Jumeirah villa in September 2026.

Paramount International Contracting LLC
September 2026

Read the project reference

Reinforced-concrete foundation removal

Sheikh Zayed Road

Arasar demolished 100 linear metres of 300–350 mm thick reinforced-concrete foundation for Wade Adams Contracting LLC on Sheikh Zayed Road in September 2026.

Wade Adams Contracting LLC
September 2026

Read the project reference

Project portfolio

UAE projects. Defined scopes.

Review the recorded Dubai and Abu Dhabi cutting, coring and selective-removal packages. Each reference identifies its actual scope and location.

Dubai Hills project by ArasarDubai Hills work detail by Arasar01Authentic project photography

Selective villa demolition · Dubai, UAE

Dubai Hills

Targeted structural sections removed for a major villa renovation while protecting the retained building and surrounding finishes.

Selective removalRenovation-ready finishControlled debris handling
View individual project evidence
Jumeirah Golf Estates project by ArasarJumeirah Golf Estates work detail by Arasar02Authentic project photography

Structural modification · Dubai, UAE

Jumeirah Golf Estates

Precision cutting and controlled dismantling delivered inside a sensitive residential setting with protected adjacent areas.

Diamond cuttingSensitive environmentEngineered sequence
View individual project evidence
Dubai Duty Free Tennis Stadium project by ArasarDubai Duty Free Tennis Stadium work detail by Arasar03Authentic project photography

Operational renovation · Dubai, UAE

Dubai Duty Free Tennis Stadium

Specialist alterations coordinated safely around the requirements of a world-class active venue.

Active venuePrecision openingsCoordinated access
View individual project evidence
Khazna Data Centre project by ArasarKhazna Data Centre work detail by Arasar04Authentic project photography

Data centre concrete cutting and coring · Abu Dhabi, UAE

Khazna Data Centre

Arasar delivered diamond cutting and core drilling for BK Gulf LLC at Khazna Data Centre in Abu Dhabi, forming new structural openings and enlarging existing ones during the 2025–2026 project.

3,500+ m concrete coring across the project56 m² concrete cutting44 specialists on site
View individual project evidence
Al Mustaqbal Road project by ArasarAl Mustaqbal Road work detail by Arasar05Authentic project photography

Concrete foundation cutting and removal · Dubai, UAE

Al Mustaqbal Road

Arasar completed a 200 m³ concrete-removal package for Wade Adams Contracting LLC at Al Mustaqbal Road in Dubai, using diamond wire sawing, diamond disc cutting and preparatory core drilling.

200 m³ concrete removed15 specialists on site6 machinery units