UAE project networkBuilt alongside industry leadersExplore all
UAE recurring project networkRecurring project partners

Companies we repeatedly work alongside across major UAE construction, infrastructure and development programmes.

Wade Adams logoWade Adams
Dutco logoDutco
Binghatti logoBinghatti
China State Construction logoChina State Construction
China Railway Construction logoChina Railway Construction
Al Naboodah logoAl Naboodah
Sobha Constructions logoSobha Constructions
Saudi Binladin Group logoSaudi Binladin Group
Hilalco logoHilalco
Kharafi National logoKharafi National
Ginco logoGinco
Western Bainoona Group logoWestern Bainoona Group
DBB Contracting logoDBB Contracting
Group AMANA logoGroup AMANA
BK Gulf logoBK Gulf
BESIX logoBESIX
ARCO General Contracting logoARCO General Contracting
ISO 9001 · ISO 14001 · ISO 45001Certified management systemsQualityEnvironmentSafety9001 · 14001 · 45001

Verified ISO management systems

Three certifications. One disciplined way of working.

Independent certification covering quality, environmental responsibility and occupational health and safety for Arasar's demolition activities.
Certified scopeWrecking & demolitionCurrent certificate cycle21 Jul 2026 — 20 Jul 2027
Arasar ISO 9001:2015 certificate previewFull certificate

Quality

ISO 9001:2015

Quality Management SystemConsistent, controlled project delivery

Documented processes, quality checks and continual improvement across certified operations.

Certificate
CR/SD-26411/01
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 9001:2015 certification marks
Arasar ISO 14001:2015 certificate previewFull certificate

Environment

ISO 14001:2015

Environmental Management SystemResponsible environmental control

A structured approach to waste, resources and environmental impact during demolition activities.

Certificate
CR/SD-26411/02
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 14001:2015 certification marks
Arasar ISO 45001:2018 certificate previewFull certificate

Health & safety

ISO 45001:2018

Occupational Health and Safety Management SystemSafer people and worksites

Systematic control of occupational risks, site hazards and worker wellbeing.

Certificate
CR/SD-26411/03
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 45001:2018 certification marks

ITMAD and EIAC marks are displayed together, at equal visual weight and without altered proportions, in accordance with the issuer's rules for web use.

Arasar team performing controlled demolition inside an industrial facility

Controlled demolition · Dubai & UAE

Controlled demolition in Dubai and across the UAE.

Arasar is a specialist controlled demolition contractor in Dubai, mobilising across the UAE for selective structural removal, redevelopment and work around sensitive neighbouring assets. Surveying, temporary works, cutting and monitored sequencing turn uncertainty into an engineered process.

Reviewed by Arasar Engineering & HSEVerified company record

The method

Controlled demolition for complex UAE sites.

Controlled demolition is defined by decision-making rather than one specific machine. The team studies load paths, retained elements, services, access and the intended end state before selecting a combination of cutting, crushing, robotic breaking or mechanical dismantling.

This approach is suited to dense urban sites, active facilities and alterations where uncontrolled collapse or vibration cannot be accepted. Hold points, monitoring and clear responsibilities are built into the sequence so that conditions can be verified before the next stage begins.

Arasar team performing controlled demolition inside an industrial facility
Plannedsequence with defined engineering hold points

Typical applications

01Selective demolition in retained buildings02Controlled structural modifications03Demolition beside sensitive neighbours04Dismantling inside active facilities

Dubai base · UAE-wide delivery

A controlled demolition contractor built around the structure.

Arasar mobilises specialist demolition teams from Dubai for projects across the UAE. Site investigation, temporary works interfaces, low-impact technology and material removal are developed as one coordinated method before structural elements are released.

Local project desk

Project enquiries, site visits and technical coordination are managed from Dubai Motor City for work in Dubai and across the Emirates.

Method-led mobilisation

The sequence, machinery, monitoring, exclusion zones and retained structure are reviewed before mobilisation rather than improvised on site.

Integrated technology

Diamond cutting, robotic breaking, scanning and mechanical dismantling can be combined around the actual structural and operational constraint.

Dubai project desk

Office 212, Detroit HouseDubai Motor City, Dubai, UAE+971 4 575 1871Open in Google Maps

Selected UAE delivery

Local work. Visible evidence.

Original Arasar project photography from Dubai assignments connected to this capability.

Why this method

Control at every interface.

Technology creates value only when it is integrated with the structure, the work environment and the required end state.

01

Structural control

Load paths and retained elements are considered throughout the removal sequence.

02

Method flexibility

Diamond cutting, robots and mechanical tools can be combined around the actual risk.

03

Measured disruption

Dust, noise, vibration and access are managed to suit the surrounding environment.

Project workflow

From uncertainty to a controlled sequence.

Each stage produces the information needed to release the next, keeping engineering and site execution aligned.

01

Investigation

Review structure, condition, utilities, neighbours and the client’s required end state.

02

Engineering and approvals

Develop the sequence, temporary works, monitoring, logistics and permit information.

03

Monitored execution

Progress through defined stages using the selected low-impact and mechanical methods.

04

Verification and handover

Inspect retained elements, remove material and document completion of the agreed scope.

Typical deliverables

Clear enough to build from.

  • Structural demolition sequence
  • Temporary works interfaces
  • Monitoring and exclusion plan
  • Waste and handover records

Technical questions

Before mobilisation.

Final methods and capacities are confirmed after a project-specific site assessment.

01Is controlled demolition the same as implosion?

No. Implosion is one specialised technique. Controlled demolition more broadly means that structural removal is engineered and sequenced using methods appropriate to the site, which often include cutting, crushing and robotic equipment.

02Can only part of a building be removed?

Yes. Selective demolition can retain designated structural and architectural elements, provided the temporary and permanent stability requirements are defined by the project engineers.

03How are dust and vibration managed?

Controls may include low-vibration cutting, remote crushers, misting, extraction, physical containment and monitoring. The combination is selected after assessing the site and surrounding receptors.

04Does Arasar deliver controlled demolition across the UAE?

Yes. Arasar is based in Dubai and mobilises for suitable controlled demolition projects across the UAE. The required engineering, approvals, logistics and work controls are reviewed for the specific asset and jurisdiction.

05Which methods are used for controlled demolition?

The method can combine diamond cutting, robotic breaking, concrete crushing, mechanical dismantling, scanning, temporary support and lifting. The structure, retained areas, access and required end state determine the final sequence.

A demanding project needs a clear first step

Bring us the constraint.

Discuss your project+971 4 575 1871info@arasarinternational.ae