UAE project networkBuilt alongside industry leadersExplore all
UAE recurring project networkRecurring project partners

Companies we repeatedly work alongside across major UAE construction, infrastructure and development programmes.

Wade Adams logoWade Adams
Dutco logoDutco
Binghatti logoBinghatti
China State Construction logoChina State Construction
China Railway Construction logoChina Railway Construction
Al Naboodah logoAl Naboodah
Sobha Constructions logoSobha Constructions
Saudi Binladin Group logoSaudi Binladin Group
Hilalco logoHilalco
Kharafi National logoKharafi National
Ginco logoGinco
Western Bainoona Group logoWestern Bainoona Group
DBB Contracting logoDBB Contracting
Group AMANA logoGroup AMANA
BK Gulf logoBK Gulf
BESIX logoBESIX
ARCO General Contracting logoARCO General Contracting
ISO 9001 · ISO 14001 · ISO 45001Certified management systemsQualityEnvironmentSafety9001 · 14001 · 45001

Verified ISO management systems

Three certifications. One disciplined way of working.

Independent certification covering quality, environmental responsibility and occupational health and safety for Arasar's demolition activities.
Certified scopeWrecking & demolitionCurrent certificate cycle21 Jul 2026 — 20 Jul 2027
Arasar ISO 9001:2015 certificate previewFull certificate

Quality

ISO 9001:2015

Quality Management SystemConsistent, controlled project delivery

Documented processes, quality checks and continual improvement across certified operations.

Certificate
CR/SD-26411/01
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 9001:2015 certification marks
Arasar ISO 14001:2015 certificate previewFull certificate

Environment

ISO 14001:2015

Environmental Management SystemResponsible environmental control

A structured approach to waste, resources and environmental impact during demolition activities.

Certificate
CR/SD-26411/02
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 14001:2015 certification marks
Arasar ISO 45001:2018 certificate previewFull certificate

Health & safety

ISO 45001:2018

Occupational Health and Safety Management SystemSafer people and worksites

Systematic control of occupational risks, site hazards and worker wellbeing.

Certificate
CR/SD-26411/03
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 45001:2018 certification marks

ITMAD and EIAC marks are displayed together, at equal visual weight and without altered proportions, in accordance with the issuer's rules for web use.

Read the certification mark usage guide

Demolition planning

Residential, Commercial & Industrial Demolition Services in Dubai

Demolition in Dubai is an engineering and logistics operation, not simply the removal of a structure. The right contractor must connect structural understanding, approvals, safety controls, machinery and responsible material handling into one deliverable plan.

Heavy demolition equipment operating on an industrial projectTechnical insight · Dubai
01

Match the method to the building

A villa alteration, an occupied commercial property and an industrial plant create completely different risk profiles. The contractor should first establish what must be removed, what must remain, how loads will change and which operations or neighbouring assets require protection.

  • Selective demolition for renovations and retained structures
  • Controlled structural dismantling for dense urban locations
  • Heavy mechanical demolition for large standalone assets
  • Diamond cutting and robotic methods for low-impact work
02

What a credible proposal should contain

A reliable proposal is based on a survey and a defined scope. It should explain the intended sequence, temporary works interfaces, access, plant, exclusion zones, environmental controls and material routes instead of presenting only a lump-sum price.

  • Site-specific method statement and risk controls
  • Programme with engineering and approval hold points
  • Dust, noise, vibration and traffic management
  • Waste separation, transport and recovery strategy
03

Questions to ask before appointment

Ask who is responsible for engineering, approvals, utility isolation and daily supervision. Confirm that the proposed equipment can physically access the work zone and that floor loading, lifting and debris movements have been considered. Local permit requirements should always be confirmed for the specific asset and jurisdiction.

  • Who signs off the demolition sequence?
  • How are adjacent structures and live services protected?
  • What happens if the surveyed condition differs from drawings?
  • How will completion and waste movements be documented?

Project note

Guidance is the starting point. The site determines the method.

Every structure, access route and operating environment is different. Final engineering, approvals and controls should be based on verified project information and a site-specific assessment.

Explore controlled demolition in Dubai and across the UAERequest a technical discussion

From guidance to a site-specific method

Bring us the constraint.

Discuss your project+971 4 575 1871info@arasarinternational.ae