Full building and villa removal
Define buildings, annexes, slabs, foundations and external structures separately. Include the available plot plan and identify which parts of the property or surroundings must remain protected.
Full demolition scope ↗Arasar International · UAE project delivery
Arasar provides full or partial demolition and specialist concrete-removal packages for Fujairah projects. Bring the plot information, the removal boundary and the current approval stage. Our Dubai-based team reviews access, service isolation and the required finished condition before confirming a site-specific offer.
A defined contractor package
Make clear whether the job ends at structural removal, below-ground clearance or a site ready for the following contractor. These are different packages even when they concern the same property.
Define buildings, annexes, slabs, foundations and external structures separately. Include the available plot plan and identify which parts of the property or surroundings must remain protected.
Full demolition scope ↗For retained buildings, show the exact wall, slab or foundation sections affected. Agree structural-review and temporary-support responsibilities alongside cutting, lifting and debris removal.
Controlled demolition ↗Separate concrete-removal quantities from excavation and reinstatement. State the dimensions, access conditions and retained services so the selected sawing or breaking method fits the work boundary.
Foundation and concrete removal ↗Plan the site interfaces
Fujairah's published services distinguish preliminary demolition approval from the final demolition licence. Your enquiry should identify the stage actually reached so the programme is based on the remaining releases.
Send the available site plan, scope and current permit or preliminary-approval reference. Identify the owner, consultant and intended contracting entity so missing project inputs can be resolved before pricing is treated as final.
State the planned removal method and which services are isolated, retained or awaiting clearance. Confirm the authority's applicable conditions before mobilising demolition plant or committing to the start of physical work.
Define the remaining foundations, required excavation or backfill level, material destination and completion records. Align the demolition contractor's handover with the next construction package.
Published project evidence
The following records describe Arasar work in Dubai or Abu Dhabi. Their documented locations and packages help you assess a proposed method and request the references relevant to your own project.
A recorded foundation-removal package of 100 linear metres. Its defined length and separate thickness information show how to describe below-ground concrete work.
Read the project record ↗Six manholes removed under a road-project package, demonstrating an individually defined demolition scope rather than removal of the entire surrounding infrastructure.
Read the project record ↗Your demolition quotation
Send the location, scope and available documents. Our team will review the removal boundary, site constraints and responsibilities before confirming the proposal.
Before appointing a company
The work boundary, quantities, method assumptions, retained-property protection, service releases, access, waste scope and final handover. Ask for explicit exclusions and remaining approval dependencies so contractor offers can be compared on the same basis.
Confirm the final release required for the actual site. Fujairah publishes a preliminary stage separately from the final demolition licence, so the project team must establish which conditions remain before physical work starts.
No. Partial work requires explicit boundaries around retained structures, finishes and services. Complete clearance must separately identify foundations, external works and the level and condition left for the next contractor.
The published office is in Dubai Motor City. Fujairah projects are reviewed for mobilisation from our Dubai team, with the scope and applicable project requirements agreed before appointment.