Concrete manhole demolition · Between Al Qudra Road and Sheikh Zayed Bin Hamdan Road, Dubai, UAE
Al Qudra Road corridor: concrete manhole demolition.
Arasar demolished six manholes for Wade Adams Contracting LLC during road construction between Al Qudra Road and Sheikh Zayed Bin Hamdan Road in July–August 2026.
Arasar demolished six manholes for Wade Adams Contracting LLC during road construction between Al Qudra Road and Sheikh Zayed Bin Hamdan Road in July–August 2026.
Project
Al Qudra Road corridor
Location
Between Al Qudra Road and Sheikh Zayed Bin Hamdan Road, Dubai, UAE
Completed manhole-demolition reference. Archive method footage, where linked, is not independently attributed to these six structures.
Equipment deployed on this package
Diamond sawing
Diamond core drilling
Defined manhole package
The recorded package covered six manholes under the road project's technical specifications.
Preparation for lifting
Diamond sawing and diamond core drilling enabled separation and subsequent lifting of the demolished elements.
Removal
The elements were removed as part of the demolition package. The record does not give an individual section weight or lifting capacity.
Scope and constraint
The documented demolition package.
Scope. Demolition of manholes using diamond sawing and diamond core drilling to prepare elements for lifting and removal.
Constraint. The concrete elements had to be separated for lifting and removal within the road-construction package and its technical specifications.
Delivery. The completed reference records six manholes demolished in accordance with the project technical specifications. Six refers to the manholes, not the number of lifted segments.
Reading the project evidence
What the project reference establishes.
The record identifies the delivered scope and its limits. It is not a generic capability claim or an illustrated reconstruction of the work.
Six structures, not six cuts
The quantity in the reference is six manholes. Individual cut lengths, element weights and numbers of lifting operations are not disclosed.
Sawing and coring
Both diamond sawing and diamond core drilling are recorded as part of preparing the elements for removal.
Infrastructure demolition
The contract concerns defined access structures within a road-construction project, not demolition of the road corridor as a whole.
From the work area
Related methods, on camera.
Original Arasar archive footage of comparable chamber work. The exact site and client of these clips are not recorded, so they are not presented as footage of this named contract.
Site video · 8 sec · No audio
Lifting a separated concrete chamber section
Arasar site footage of a crane lifting a large concrete chamber section above an excavation.
Need a concrete manhole or access chamber removed? Provide the chamber layout, depth, wall and base thicknesses, service status, lifting access and required removal limits for a coordinated cutting and removal proposal.