UAE project networkBuilt alongside industry leadersExplore all
UAE recurring project networkRecurring project partners

Companies we repeatedly work alongside across major UAE construction, infrastructure and development programmes.

Wade Adams logoWade Adams
Dutco logoDutco
Binghatti logoBinghatti
China State Construction logoChina State Construction
China Railway Construction logoChina Railway Construction
Al Naboodah logoAl Naboodah
Sobha Constructions logoSobha Constructions
Saudi Binladin Group logoSaudi Binladin Group
Hilalco logoHilalco
Kharafi National logoKharafi National
Ginco logoGinco
Western Bainoona Group logoWestern Bainoona Group
DBB Contracting logoDBB Contracting
Group AMANA logoGroup AMANA
BK Gulf logoBK Gulf
BESIX logoBESIX
ARCO General Contracting logoARCO General Contracting
ISO 9001 · ISO 14001 · ISO 45001Certified management systemsQualityEnvironmentSafety9001 · 14001 · 45001

Verified ISO management systems

Three certifications. One disciplined way of working.

Independent certification covering quality, environmental responsibility and occupational health and safety for Arasar's demolition activities.
Certified scopeWrecking & demolitionCurrent certificate cycle21 Jul 2026 — 20 Jul 2027
Arasar ISO 9001:2015 certificate previewFull certificate

Quality

ISO 9001:2015

Quality Management SystemConsistent, controlled project delivery

Documented processes, quality checks and continual improvement across certified operations.

Certificate
CR/SD-26411/01
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 9001:2015 certification marks
Arasar ISO 14001:2015 certificate previewFull certificate

Environment

ISO 14001:2015

Environmental Management SystemResponsible environmental control

A structured approach to waste, resources and environmental impact during demolition activities.

Certificate
CR/SD-26411/02
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 14001:2015 certification marks
Arasar ISO 45001:2018 certificate previewFull certificate

Health & safety

ISO 45001:2018

Occupational Health and Safety Management SystemSafer people and worksites

Systematic control of occupational risks, site hazards and worker wellbeing.

Certificate
CR/SD-26411/03
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 45001:2018 certification marks

ITMAD and EIAC marks are displayed together, at equal visual weight and without altered proportions, in accordance with the issuer's rules for web use.

Arasar team reviewing concrete openings inside Khazna Data Centre in Abu Dhabi

Data centre concrete cutting and coring · Abu Dhabi, UAE

Khazna Data Centre: data centre concrete cutting and coring.

Arasar delivered diamond cutting and core drilling for BK Gulf LLC at Khazna Data Centre in Abu Dhabi, forming new structural openings and enlarging existing ones during the 2025–2026 project.

First-party project record

What Arasar delivered.

Arasar delivered diamond cutting and core drilling for BK Gulf LLC at Khazna Data Centre in Abu Dhabi, forming new structural openings and enlarging existing ones during the 2025–2026 project.

Project
Khazna Data Centre
Location
Abu Dhabi, UAE
Work type
Data centre concrete cutting and coring
Related capability
Concrete core drilling

Completed specialist work

The project in figures.

Client: BK Gulf LLC
Project period: 2025–2026. Figures from Arasar's completed-project record.

Concrete coring across the project
3,500+ m
Concrete cutting
56 m²
Specialists on site
44
Machinery units
23
Project duration
6+ months

The coring figure is the recorded project total in metres, not the depth of one bore. Concrete cutting is reported in square metres, not as a floor area cleared. The work does not substantiate complete data centre dismantling or certified data destruction.

Equipment deployed on this package

  • 12 coring machines
  • 3 wall saws
  • 5 jackhammers
  • 2 electric handsaws
  • 1 electric ringsaw

New openings and enlargements

Diamond drilling and cutting were used to form new structural openings and enlarge existing ones according to the project stage.

Finishing the opening edges

Manual finishing and trimming completed the recorded opening work. Cutting and finishing were parts of the same specialist package.

Site teams and shifts

The record describes day and night shifts, on-site skills development and adherence to the site's safety requirements. These are project arrangements, not guaranteed turnaround times for another site.

Scope and constraint

The work behind the images.

Scope. Formation of new structural openings and enlargement of existing openings using diamond drilling and diamond cutting, with manual finishing and trimming of the opening edges.

Constraint. The cutting package followed the current construction stage. Day and night shifts, site safety requirements and coordination within the work areas shaped the delivery programme.

Delivery. The completed-project record reports more than 3,500 metres of concrete coring and 56 m² of concrete cutting across a programme lasting more than six months, with 44 specialists and 23 machinery units on site.

Reading the project evidence

What the photographs document.

The details below distinguish the visible work from the wider project brief, so you can assess whether the experience is relevant to your own site.

Structural opening context

The inspection photograph shows the team beneath existing and marked openings. It links the work to a defined concrete alteration rather than removal of the building or its IT systems.

Diamond core drilling

The drill stand, barrel and operator are visible together. This illustrates the coring method recorded for the work package without inferring an individual hole diameter or depth.

Work-area coordination

The portfolio includes site briefing and inspection photographs and records day and night shifts. It does not state that the data centre remained operational during cutting.

Discuss a similar project

Plan your next structural alteration.

Planning concrete openings or core holes for a data centre, plant room or infrastructure project? Send the opening schedule, concrete dimensions, marked drawings and access photographs. Specify new openings versus enlargements, retained services and the required finish for a scoped proposal.

Evidence status

Original Arasar photography

First-party Arasar project record based on the company's completed-project portfolio and original Khazna work-area photographs, authorised for publication in October 2026. This is concrete cutting and coring evidence, not a complete data centre decommissioning, IT removal or facility handover claim. For a similar project, review Arasar's demolition contracting capabilities and company credentials and enquiry requirements.

Review the related service