UAE project networkBuilt alongside industry leadersExplore all
UAE recurring project networkRecurring project partners

Companies we repeatedly work alongside across major UAE construction, infrastructure and development programmes.

Wade Adams logoWade Adams
Dutco logoDutco
Binghatti logoBinghatti
China State Construction logoChina State Construction
China Railway Construction logoChina Railway Construction
Al Naboodah logoAl Naboodah
Sobha Constructions logoSobha Constructions
Saudi Binladin Group logoSaudi Binladin Group
Hilalco logoHilalco
Kharafi National logoKharafi National
Ginco logoGinco
Western Bainoona Group logoWestern Bainoona Group
DBB Contracting logoDBB Contracting
Group AMANA logoGroup AMANA
BK Gulf logoBK Gulf
BESIX logoBESIX
ARCO General Contracting logoARCO General Contracting
ISO 9001 · ISO 14001 · ISO 45001Certified management systemsQualityEnvironmentSafety9001 · 14001 · 45001

Verified ISO management systems

Three certifications. One disciplined way of working.

Independent certification covering quality, environmental responsibility and occupational health and safety for Arasar's demolition activities.
Certified scopeWrecking & demolitionCurrent certificate cycle21 Jul 2026 — 20 Jul 2027
Arasar ISO 9001:2015 certificate previewFull certificate

Quality

ISO 9001:2015

Quality Management SystemConsistent, controlled project delivery

Documented processes, quality checks and continual improvement across certified operations.

Certificate
CR/SD-26411/01
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 9001:2015 certification marks
Arasar ISO 14001:2015 certificate previewFull certificate

Environment

ISO 14001:2015

Environmental Management SystemResponsible environmental control

A structured approach to waste, resources and environmental impact during demolition activities.

Certificate
CR/SD-26411/02
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 14001:2015 certification marks
Arasar ISO 45001:2018 certificate previewFull certificate

Health & safety

ISO 45001:2018

Occupational Health and Safety Management SystemSafer people and worksites

Systematic control of occupational risks, site hazards and worker wellbeing.

Certificate
CR/SD-26411/03
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 45001:2018 certification marks

ITMAD and EIAC marks are displayed together, at equal visual weight and without altered proportions, in accordance with the issuer's rules for web use.

Villa slab and column removal · Palm Jumeirah, Dubai, UAE

Palm Jumeirah: villa slab and column removal.

Arasar completed 200 m² of concrete cutting and removed slab and column elements for Paramount International Contracting LLC at a Palm Jumeirah villa in September 2026.

First-party project record

What Arasar delivered.

Arasar completed 200 m² of concrete cutting and removed slab and column elements for Paramount International Contracting LLC at a Palm Jumeirah villa in September 2026.

Project
Palm Jumeirah
Location
Palm Jumeirah, Dubai, UAE
Work type
Villa slab and column removal
Related capability
Selective demolition

Completed specialist work

The project in figures.

Client: Paramount International Contracting LLC
Project period: September 2026. Figures from Arasar's completed-project record.

Concrete cutting completed
200 m²

Completed selective structural-demolition package. No property address, homeowner identity, full-villa demolition or unsupported lifting weight is published.

Equipment deployed on this package

  • Diamond sawing
  • Core drilling for lifting holes

Slab and column separation

Diamond sawing separated the reinforced-concrete slab and column elements within the renovation scope.

Preparation for removal

Core-drilled lifting holes formed part of preparing the demolished elements for removal.

Loading and clearance

The demolished concrete was loaded and removed so the next phase of renovation could proceed.

Scope and constraint

The documented demolition package.

Scope. Diamond sawing of a reinforced-concrete floor slab and columns, core drilling of lifting holes, and loading and removal of the demolished concrete.

Constraint. The work concerned selected structural elements within a villa renovation. Cutting, lifting-hole preparation, loading and removal formed a connected package.

Delivery. The project reference records 200 m² of concrete cutting completed and the demolished elements removed, preparing the site for the next renovation phase.

Reading the project evidence

What the project reference establishes.

The record identifies the delivered scope and its limits. It is not a generic capability claim or an illustrated reconstruction of the work.

Structural renovation, not full-villa removal

The stated scope is the reinforced-concrete floor slab and columns. The record does not say the entire villa was demolished.

Cutting quantity

200 m² is the documented concrete-cutting quantity. It is not a claim about the villa's floor area or the volume of concrete removed.

Removal included

Lifting holes, loading and removal were recorded alongside sawing, with the site prepared for the next renovation phase.

Discuss a similar project

Plan your next structural alteration.

Changing a villa slab or columns while retaining the surrounding property? Send structural drawings, marked removal boundaries, access and lifting-space photographs, and the intended handover condition for a scoped technical proposal.

Evidence status

Documented Arasar project reference

First-party reference supplied by Arasar, recording the client, location, period and delivered work. No unrelated photograph is presented as a photograph of this contract. For a similar project, review Arasar's demolition contracting capabilities and company credentials and enquiry requirements.

Review the related service