What the video shows
A core-drilling rig is fixed beside a concrete wall, with the cylindrical barrel aligned horizontally. The operator works behind the rig while other team members stand alongside the work area.
Visible work details
- The drill stand, barrel and operator are shown together.
- The setup is within a high-ceilinged interior work area.
- Hole diameter, depth and the identity of the project are not inferred from the clip.
Location context
Original Arasar site archive. No specific facility or client is assigned to this footage.
Planning a similar intervention?
For a comparable service opening, provide the required diameter, concrete thickness, opening schedule, drawings and available access. Identify any retained services before the drilling scope is agreed.
Discuss your project