UAE project networkBuilt alongside industry leadersExplore all
UAE recurring project networkRecurring project partners

Companies we repeatedly work alongside across major UAE construction, infrastructure and development programmes.

Wade Adams logoWade Adams
Dutco logoDutco
Binghatti logoBinghatti
China State Construction logoChina State Construction
China Railway Construction logoChina Railway Construction
Al Naboodah logoAl Naboodah
Sobha Constructions logoSobha Constructions
Saudi Binladin Group logoSaudi Binladin Group
Hilalco logoHilalco
Kharafi National logoKharafi National
Ginco logoGinco
Western Bainoona Group logoWestern Bainoona Group
DBB Contracting logoDBB Contracting
Group AMANA logoGroup AMANA
BK Gulf logoBK Gulf
BESIX logoBESIX
ARCO General Contracting logoARCO General Contracting
ISO 9001 · ISO 14001 · ISO 45001Certified management systemsQualityEnvironmentSafety9001 · 14001 · 45001

Verified ISO management systems

Three certifications. One disciplined way of working.

Independent certification covering quality, environmental responsibility and occupational health and safety for Arasar's demolition activities.
Certified scopeWrecking & demolitionCurrent certificate cycle21 Jul 2026 — 20 Jul 2027
Arasar ISO 9001:2015 certificate previewFull certificate

Quality

ISO 9001:2015

Quality Management SystemConsistent, controlled project delivery

Documented processes, quality checks and continual improvement across certified operations.

Certificate
CR/SD-26411/01
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 9001:2015 certification marks
Arasar ISO 14001:2015 certificate previewFull certificate

Environment

ISO 14001:2015

Environmental Management SystemResponsible environmental control

A structured approach to waste, resources and environmental impact during demolition activities.

Certificate
CR/SD-26411/02
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 14001:2015 certification marks
Arasar ISO 45001:2018 certificate previewFull certificate

Health & safety

ISO 45001:2018

Occupational Health and Safety Management SystemSafer people and worksites

Systematic control of occupational risks, site hazards and worker wellbeing.

Certificate
CR/SD-26411/03
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 45001:2018 certification marks

ITMAD and EIAC marks are displayed together, at equal visual weight and without altered proportions, in accordance with the issuer's rules for web use.

Concrete scanning

Reading a Concrete Scanning Report in Dubai: Marks, Depth and Limitations

A colourful scan image or a set of marks on a slab is only useful when the receiving team understands what was surveyed and what the findings mean. This guide helps clients and project teams review the completeness of a concrete scanning handover in Dubai. It is not a guide to independently interpreting radar data or approving structural work.

Technician moving a ground-penetrating radar scanner over a marked concrete slabTechnical insight · Dubai

Need an execution contractor?

Concrete scanning and GPR in Dubai and across the UAE.

This article explains the planning question. For scope review, method selection and a site-specific technical proposal, continue to Arasar's primary service page.

Explore concrete scanning and GPR services in Dubai and the UAECall +971 52 527 0635
01

Match the record to the actual opening

Start with identification: project, level, room or grid reference, surveyed element and opening ID. Check the drawing revision and survey date. An image without these references may be difficult to relate to the physical workface, especially where many similar openings are proposed.

Confirm the extent of the surveyed area rather than assuming the report covers the entire room or structure. If a proposed opening was relocated or enlarged, ask whether the recorded investigation still covers the new requirement. A document title alone does not establish that coverage.

Prepare coordinated opening references for MEP coringDefine the scan scope before requesting a survey
02

Distinguish the types of handover information

Hilti’s detection documentation distinguishes on-site visual outputs from exported information used for further analysis and reporting. Agree the output needed by your project instead of assuming that “3D scanning” always includes the same deliverables. The following is a completeness checklist, not a universal reporting standard.

Concrete scan handover completeness checklist
RecordQuestion for the survey teamWhy it matters
Area and referencesWhere exactly was the investigation performed?Connects the record to the opening and drawing
Site markingsWhat does each mark mean and where is the legend?Avoids assumptions based only on colour
Annotated outputWhich findings correspond to which location?Makes the handover usable by the receiving team
Depth informationFrom which surface and with what limitations?Avoids confusing cover, object depth and thickness
UncertaintyWhich areas or questions remain unresolved?Separates evidence from assumptions
Decision ownershipWho reviews findings against the proposed work?Keeps surveying distinct from permission to cut
Manufacturer information on scan outputs and reports
03

Ask what a depth value actually represents

A number may refer to a detected object below the scanned surface, an estimated element thickness or a setting used during data collection. Ask the survey specialist to explain the reference and meaning. Do not treat all depth values as equivalent or assume a displayed number is a guarantee of safe remaining clearance.

When concrete thickness is the project question, it should be stated in the survey scope and addressed in the findings with the applicable limitations. If the report does not resolve it, record the unanswered question for the responsible team. A generic equipment range does not answer a particular slab-thickness enquiry.

04

Keep uncertain areas visible in the decision record

A useful report can include uncertainty. Request a clear distinction between an interpreted finding, an area not investigated and a result that requires further review. Silence on a report should not be converted into a claim that there are no concealed objects.

Compare the report’s scope with the drawings and site references. If information conflicts, ask the responsible parties to resolve the discrepancy before treating the opening as released. The required next step depends on the actual question; this guide does not prescribe additional testing or structural conclusions.

Understand the separate structural review
05

Record changes between survey and execution

The handover should remain traceable when a drawing revision, opening position or work area changes. Keep the original record and the clarification together rather than relying on an informal verbal instruction. Identify which team member receives and resolves the change.

For repeated openings, use the same IDs in the bore schedule and survey records. This reduces ambiguity about which location a clarification concerns. Where the receiving contractor did not commission the scan, confirm that the complete report and its limitations have been shared.

06

Request the records required for the next trade

Tell the survey provider whether the next step is core drilling, saw cutting or another investigation. Define the drawing format, location references and evidence the receiving team requires before commissioning the work. Include those deliverables in the quotation comparison.

For Arasar concrete scanning enquiries, provide the proposed work area and the reporting requirement together. Our service page covers the survey discussion; the related drilling and cutting pages cover execution after the necessary project review.

Discuss concrete scanning and reportingPlan the concrete cutting package
FAQ

Frequently asked questions

01Does a 3D scanning image authorise concrete cutting?

No. It is survey information. The responsible team must consider it with the design, limitations and required approvals.

02Is a detected object depth the same as slab thickness?

Not necessarily. Ask what the value refers to, its reference surface and its limitations. Thickness needs to be addressed as a specific survey objective.

03Should every scanning contractor use the same marking colours?

Do not assume a universal colour convention. Obtain the legend and explanation for the actual survey and make them available to the receiving team.

04What if an opening changes after scanning?

Ask whether the new location and extent are covered by the existing investigation. Keep the drawing revision and the resulting clarification with the project record.

Sources

Technical and regulatory references

Requirements remain project- and authority-specific. These public sources support the technical or regulatory points used in this guide.

Project note

Guidance is the starting point. The site determines the method.

Every structure, access route and operating environment is different. Final engineering, approvals and controls should be based on verified project information and a site-specific assessment.

Explore concrete scanning and GPR services in Dubai and the UAEExplore controlled demolition in Dubai and across the UAEExplore diamond concrete cutting in Dubai and across the UAERequest a technical discussion

From guidance to a site-specific method

Bring us the constraint.

Discuss your project+971 52 527 0635info@arasarinternational.ae