UAE project networkBuilt alongside industry leadersExplore all
UAE recurring project networkRecurring project partners

Companies we repeatedly work alongside across major UAE construction, infrastructure and development programmes.

Wade Adams logoWade Adams
Dutco logoDutco
Binghatti logoBinghatti
China State Construction logoChina State Construction
China Railway Construction logoChina Railway Construction
Al Naboodah logoAl Naboodah
Sobha Constructions logoSobha Constructions
Saudi Binladin Group logoSaudi Binladin Group
Hilalco logoHilalco
Kharafi National logoKharafi National
Ginco logoGinco
Western Bainoona Group logoWestern Bainoona Group
DBB Contracting logoDBB Contracting
Group AMANA logoGroup AMANA
BK Gulf logoBK Gulf
BESIX logoBESIX
ARCO General Contracting logoARCO General Contracting
ISO 9001 · ISO 14001 · ISO 45001Certified management systemsQualityEnvironmentSafety9001 · 14001 · 45001

Verified ISO management systems

Three certifications. One disciplined way of working.

Independent certification covering quality, environmental responsibility and occupational health and safety for Arasar's demolition activities.
Certified scopeWrecking & demolitionCurrent certificate cycle21 Jul 2026 — 20 Jul 2027
Arasar ISO 9001:2015 certificate previewFull certificate

Quality

ISO 9001:2015

Quality Management SystemConsistent, controlled project delivery

Documented processes, quality checks and continual improvement across certified operations.

Certificate
CR/SD-26411/01
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 9001:2015 certification marks
Arasar ISO 14001:2015 certificate previewFull certificate

Environment

ISO 14001:2015

Environmental Management SystemResponsible environmental control

A structured approach to waste, resources and environmental impact during demolition activities.

Certificate
CR/SD-26411/02
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 14001:2015 certification marks
Arasar ISO 45001:2018 certificate previewFull certificate

Health & safety

ISO 45001:2018

Occupational Health and Safety Management SystemSafer people and worksites

Systematic control of occupational risks, site hazards and worker wellbeing.

Certificate
CR/SD-26411/03
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 45001:2018 certification marks

ITMAD and EIAC marks are displayed together, at equal visual weight and without altered proportions, in accordance with the issuer's rules for web use.

Demolition planning

Demolition Method Selection Matrix for Dubai and UAE Projects

A demolition method should be selected from the structure, retained assets, access, exposure and final handover—not from a preferred machine. This Arasar field framework gives UAE project teams a practical starting point for deciding which method, or combination of methods, belongs in the technical proposal.

Demolition plant and specialist equipment prepared for an engineered removal sequenceTechnical insight · Dubai

Need an execution contractor?

Controlled demolition in Dubai and across the UAE.

This article explains the planning question. For scope review, method selection and a site-specific technical proposal, continue to Arasar's primary service page.

Explore controlled demolition in Dubai and across the UAECall +971 4 575 1871
01

Start with the outcome, not the equipment

The first decision is what the project must deliver: a cleared plot, a retained shell, a new structural opening, a released plant zone or a component prepared for lifting. The demolition system follows that outcome. On complex UAE projects, the final method commonly combines scanning, temporary support, cutting, breaking, lifting and material handling rather than relying on one machine.

The matrix below is a screening tool, not a substitute for a site survey or engineering review. It helps the project team identify the information that should be resolved before a contractor prices or programmes the work.

Arasar demolition method selection matrix
Project conditionLikely method familyVerify before selection
Standalone structure with clear plant accessProgressive mechanical demolitionReach, ground bearing, stability and debris route
Part of the structure must remainSelective or controlled demolitionRetention line, load path and temporary support
Confined or high-exposure work zoneRemote robotic demolitionAccess dimensions, floor loading, power and attachment
Thick or irregular reinforced concreteDiamond wire sawingWire route, support, lifting and water recovery
Straight wall or slab openingWall or floor sawingScan results, depth, panel weight and removal access
Steel or concrete component to be reused or liftedStructural dismantlingConnections, centre of gravity, rigging and crane capacity
Operational industrial assetPhased decommissioning and dismantlingIsolation boundary, shutdowns and retained systems
Review Arasar demolition services in Dubai and the UAE
02

Score the constraints that change the method

Arasar screens each proposed method against the same core constraints. A method that is fast in open ground may be unsuitable on an upper floor, beside an occupied space or where a cut section cannot be lifted safely. The strongest option is the one that controls the whole release-and-removal sequence.

  • Structure: material, condition, load path, height and altered areas
  • Retention: elements, finishes, services and operations that must remain
  • Access: doorways, lifts, crane positions, machine routes and emergency access
  • Exposure: people, neighbours, falling material, dust, noise and vibration
  • Logistics: panel weights, debris routes, loading areas and approved destinations
  • Handover: cleared level, retained edges, records and next-trade requirements
03

Connect the method to the UAE permit package

The public Dubai Development Authority demolition application asks for the demolition method, scope, site plan, authority NOCs, hoarding layout, method statement, HSE and emergency plan, risk assessments and a study of effects on neighbouring buildings. That makes method selection part of the approval evidence, not only a production choice.

Requirements differ by jurisdiction, building and project status. The responsible consultant, contractor and authority route should therefore be confirmed for the specific asset before mobilisation.

See the Dubai demolition document guideExplore controlled demolition methods
04

Information that makes a demolition enquiry usable

A useful enquiry allows the contractor to test the matrix against the real site. Send drawings where available, photographs, the removal boundary, access restrictions, retained operations, known services, target programme and required handover. Unknowns should be stated rather than hidden because they affect surveys, allowances and hold points.

  • Exact demolition or retention drawings
  • Building height, structure type and known alterations
  • Site, crane, machine and waste-vehicle access
  • Occupancy, shutdown windows and sensitive neighbours
  • Utility isolation status and available surveys
  • Required material recovery and completion records
Review heavy demolition capabilityReview selective demolition capabilityReview structural dismantling capability
FAQ

Frequently asked questions

01Which demolition method is best for a building in Dubai?

There is no universal best method. Structure, retained assets, access, neighbours, utilities, programme and handover determine whether mechanical, selective, robotic, cutting or dismantling methods should be used alone or together.

02Can several demolition methods be used on one project?

Yes. Complex projects often combine scanning, temporary support, diamond cutting, robotic breaking, mechanical demolition, lifting and material processing within one controlled sequence.

03Does controlled demolition always mean explosives?

No. In normal project language, controlled demolition can describe engineered selective removal using cutting, robotic or mechanical systems. Any authority terminology and permit category must be confirmed for the specific project.

04What information is needed before pricing demolition?

Provide drawings, photographs, removal limits, access, occupancy, utility status, programme, authority context and required handover. A site survey may still be needed before a firm method and price are issued.

Sources

Technical and regulatory references

Requirements remain project- and authority-specific. These public sources support the technical or regulatory points used in this guide.

Project note

Guidance is the starting point. The site determines the method.

Every structure, access route and operating environment is different. Final engineering, approvals and controls should be based on verified project information and a site-specific assessment.

Explore controlled demolition in Dubai and across the UAEExplore robotic demolition and breaking in Dubai and across the UAEExplore demolition services in Dubai and across the UAERequest a technical discussion