UAE project networkBuilt alongside industry leadersExplore all
UAE recurring project networkRecurring project partners

Companies we repeatedly work alongside across major UAE construction, infrastructure and development programmes.

Wade Adams logoWade Adams
Dutco logoDutco
Binghatti logoBinghatti
China State Construction logoChina State Construction
China Railway Construction logoChina Railway Construction
Al Naboodah logoAl Naboodah
Sobha Constructions logoSobha Constructions
Saudi Binladin Group logoSaudi Binladin Group
Hilalco logoHilalco
Kharafi National logoKharafi National
Ginco logoGinco
Western Bainoona Group logoWestern Bainoona Group
DBB Contracting logoDBB Contracting
Group AMANA logoGroup AMANA
BK Gulf logoBK Gulf
BESIX logoBESIX
ARCO General Contracting logoARCO General Contracting
ISO 9001 · ISO 14001 · ISO 45001Certified management systemsQualityEnvironmentSafety9001 · 14001 · 45001

Verified ISO management systems

Three certifications. One disciplined way of working.

Independent certification covering quality, environmental responsibility and occupational health and safety for Arasar's demolition activities.
Certified scopeWrecking & demolitionCurrent certificate cycle21 Jul 2026 — 20 Jul 2027
Arasar ISO 9001:2015 certificate previewFull certificate

Quality

ISO 9001:2015

Quality Management SystemConsistent, controlled project delivery

Documented processes, quality checks and continual improvement across certified operations.

Certificate
CR/SD-26411/01
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 9001:2015 certification marks
Arasar ISO 14001:2015 certificate previewFull certificate

Environment

ISO 14001:2015

Environmental Management SystemResponsible environmental control

A structured approach to waste, resources and environmental impact during demolition activities.

Certificate
CR/SD-26411/02
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 14001:2015 certification marks
Arasar ISO 45001:2018 certificate previewFull certificate

Health & safety

ISO 45001:2018

Occupational Health and Safety Management SystemSafer people and worksites

Systematic control of occupational risks, site hazards and worker wellbeing.

Certificate
CR/SD-26411/03
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 45001:2018 certification marks

ITMAD and EIAC marks are displayed together, at equal visual weight and without altered proportions, in accordance with the issuer's rules for web use.

Core drilling

Wet vs Dry Core Drilling in Dubai: Method, Dust and Slurry

Wet and dry core drilling are not interchangeable labels. Cooling, material, diameter, reinforcement, water sensitivity, dust extraction and drilling orientation determine the practical system. This guide helps Dubai project teams define the method before comparing quotations.

Specialist drilling work planned inside an operational industrial environmentTechnical insight · Dubai

Need an execution contractor?

Concrete core drilling in Dubai and across the UAE.

This article explains the planning question. For scope review, method selection and a site-specific technical proposal, continue to Arasar's primary service page.

Explore concrete core drilling services in Dubai and the UAECall +971 4 575 1871
01

Compare the methods around the work face

Wet diamond coring uses water to cool the bit and transport cut material from the kerf. It is widely used for reinforced concrete and rig-based drilling, but needs a controlled supply and a reliable collection route for slurry. Dry coring is useful for suitable materials or water-sensitive areas when the equipment and bit are designed for the application and effective dust extraction is provided.

Wet and dry core drilling compared
FactorWet core drillingDry core drilling
Typical materialReinforced concrete and demanding boresSuitable masonry or approved dry applications
Primary controlWater supply and slurry collectionDust extraction and bit temperature
Common setupHand-held or rig-based depending on diameterApplication-specific hand-held or rig system
Sensitive environmentNeeds bunding, collection and protectionAvoids slurry but requires strong dust control
Overhead workDedicated collector and wet vacuum requiredOnly with equipment and controls approved for the orientation
Review Arasar concrete core drilling services
02

The bore schedule drives the equipment

Provide diameter, depth, quantity, material, reinforcement expectation, orientation and finished tolerance. A large or deep reinforced-concrete bore may need a rigid stand, engineered anchorage and staged core recovery. A smaller penetration may use a different drive unit and setup. The correct system is defined from the schedule and the structure, not from a generic per-hole rate.

  • Diameter, depth and drilling angle
  • Wall, slab, beam, foundation or masonry substrate
  • Reinforcement and post-tension risk
  • Rig anchorage or vacuum-base feasibility
  • Breakthrough zone and core-retention plan
  • Water, power, ventilation and waste route
03

Control overhead drilling and occupied areas

Overhead wet drilling requires a water-collection system and suitable wet vacuum, with electrical protection and a controlled breakthrough zone. In occupied areas, protect finishes and operations from water, slurry, dust, noise and released cores. Work zones and timing should be coordinated before drilling starts.

Dry drilling is not automatically the cleaner option. Without compatible dust extraction it can transfer the problem from slurry to airborne dust. The project should compare the complete containment system rather than only the drilling machine.

04

Request a quote that states the full method

A useful core-drilling quotation states scanning responsibility, final set-out, rig fixing, drilling mode, water or dust control, core handling, access, protection, debris removal and completion records. Where the bore supports an MEP service, include the sleeve, fire-stopping or receiving-trade requirement so the finished geometry is understood.

Use the Dubai core drilling planning checklistPlan scanning before drilling
FAQ

Frequently asked questions

01Is wet or dry core drilling better for reinforced concrete?

Wet rig-based diamond coring is commonly used for reinforced concrete because water cools the system and carries cut material, but the final choice depends on diameter, depth, reinforcement, access and site controls.

02Can core drilling be completed without water?

Dry systems exist for suitable materials and equipment configurations. Dry work still needs effective dust extraction and must be appropriate for the substrate, bit, diameter and orientation.

03How is slurry controlled during core drilling?

Water collectors, bunding, wet vacuums and controlled supply can capture slurry at the drilling point. The exact setup depends on orientation, access and the sensitivity of surrounding areas.

04Should a slab be scanned before core drilling?

Where reinforcement, post-tensioning or concealed services may conflict with the bore, suitable scanning and engineering coordination should inform the final set-out.

Sources

Technical and regulatory references

Requirements remain project- and authority-specific. These public sources support the technical or regulatory points used in this guide.

Project note

Guidance is the starting point. The site determines the method.

Every structure, access route and operating environment is different. Final engineering, approvals and controls should be based on verified project information and a site-specific assessment.

Explore concrete core drilling services in Dubai and the UAEExplore rock coring and deep core drilling in Dubai and across the UAERequest a technical discussion