UAE project networkBuilt alongside industry leadersExplore all
UAE recurring project networkRecurring project partners

Companies we repeatedly work alongside across major UAE construction, infrastructure and development programmes.

Wade Adams logoWade Adams
Dutco logoDutco
Binghatti logoBinghatti
China State Construction logoChina State Construction
China Railway Construction logoChina Railway Construction
Al Naboodah logoAl Naboodah
Sobha Constructions logoSobha Constructions
Saudi Binladin Group logoSaudi Binladin Group
Hilalco logoHilalco
Kharafi National logoKharafi National
Ginco logoGinco
Western Bainoona Group logoWestern Bainoona Group
DBB Contracting logoDBB Contracting
Group AMANA logoGroup AMANA
BK Gulf logoBK Gulf
BESIX logoBESIX
ARCO General Contracting logoARCO General Contracting
ISO 9001 · ISO 14001 · ISO 45001Certified management systemsQualityEnvironmentSafety9001 · 14001 · 45001

Verified ISO management systems

Three certifications. One disciplined way of working.

Independent certification covering quality, environmental responsibility and occupational health and safety for Arasar's demolition activities.
Certified scopeWrecking & demolitionCurrent certificate cycle21 Jul 2026 — 20 Jul 2027
Arasar ISO 9001:2015 certificate previewFull certificate

Quality

ISO 9001:2015

Quality Management SystemConsistent, controlled project delivery

Documented processes, quality checks and continual improvement across certified operations.

Certificate
CR/SD-26411/01
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 9001:2015 certification marks
Arasar ISO 14001:2015 certificate previewFull certificate

Environment

ISO 14001:2015

Environmental Management SystemResponsible environmental control

A structured approach to waste, resources and environmental impact during demolition activities.

Certificate
CR/SD-26411/02
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 14001:2015 certification marks
Arasar ISO 45001:2018 certificate previewFull certificate

Health & safety

ISO 45001:2018

Occupational Health and Safety Management SystemSafer people and worksites

Systematic control of occupational risks, site hazards and worker wellbeing.

Certificate
CR/SD-26411/03
Scope
Wrecking & demolition
EIAC accreditation and ITMAD ISO 45001:2018 certification marks

ITMAD and EIAC marks are displayed together, at equal visual weight and without altered proportions, in accordance with the issuer's rules for web use.

Building removal · Strip-out · Concrete engineering

Demolition services in Abu Dhabi.

From complete building removal to selective concrete cutting, start with a scope that protects what must remain. Arasar's Dubai-based demolition team reviews projects in Abu Dhabi, with site-specific mobilisation and approval requirements.

Choosing a demolition contractor in Abu Dhabi

Define the asset, not just the demolition method.

Offices, shops and interiors

A strip-out can remove partitions, ceilings, finishes and agreed services while retaining the shell. In occupied buildings, access, segregation and shutdown windows need to be agreed with the operator.

Complete strip-out · Selective demolition

Concrete and robotic removal

Openings, thick sections and restricted access can call for diamond wire sawing, wall sawing, drilling or robotic breaking. The structure, lifting plan and access determine the method.

Concrete cutting · Wire sawing · Robotic demolition

For industrial assets, define plant and equipment dismantling separately from structural work. For a server room or data centre, include the IT asset and facility decommissioning scope. Data destruction certification is not assumed to be included.

Location and mobilisation

Abu Dhabi city, Al Ain or Al Dhafra?

The exact plot matters. DMT lists separate municipal contacts for Abu Dhabi city, Al Ain and Al Dhafra. Include the municipality, development or facility name, owner and appointed consultant in your enquiry so the correct approval route can be checked.

Our project team is based at Office 212, Detroit House, Dubai Motor City, Dubai, UAE. We do not list an Abu Dhabi branch. The proposal must confirm the applicable contractor eligibility, equipment access, transport, supervision and mobilisation arrangements for your site.

Before demolition begins

Build approvals and site protection into the scope.

Abu Dhabi City Municipality's published demolition safety guidance calls for a valid permit, protection of neighbouring property and the public, trained operators, protective equipment, noise controls, secure scaffolding, site cleanliness and emergency planning. Use it as a preparation reference, then confirm the current requirements for your site with the relevant authority and consultant. Read the municipality's safety guidance.

  1. Survey and boundaries: provide current drawings, photos, retained structures and any shared walls. Resolve missing structural information before agreeing a removal sequence.
  2. Authority and owner approvals: identify the permit holder, consultant, property owner and any development or facility-specific permissions. A Dubai document checklist is not a substitute for the Abu Dhabi process.
  3. Services and occupancy: identify live utilities, agreed isolation responsibilities, adjacent occupants and working-hour constraints.
  4. Method and logistics: establish temporary support, machine access, lifting arrangements, exclusion zones, dust and noise controls, and the route for removed material.
  5. Handover: agree removal limits, waste documentation, retained assets and the condition required for the next contractor.

This is a project-scoping checklist, not a permit application or a promise of approval. Fees, required documents and start dates must be confirmed for the actual project.

Contractor assessment

Review the evidence and its actual location.

Our published Dubai Hills selective demolition record and Jumeirah Golf Estates structural modification record show relevant methods on Dubai projects. They are not presented as Abu Dhabi case studies.

Check company details, published ISO certificates and the proposed team and method against your prequalification requirements. For another emirate, see our UAE service coverage.

Your project questions

Planning demolition in Abu Dhabi.

01Is Arasar based in Abu Dhabi?

Our published office is in Dubai Motor City. Our team reviews demolition and specialist concrete work in Abu Dhabi on a project basis. Site access, contractor eligibility, approvals and mobilisation arrangements must be confirmed for each scope before work starts.

02Can I request partial demolition or an office strip-out?

Yes. Send marked plans showing the partitions, finishes, services or structural sections to remove and everything that must remain. A full strip-out and structural demolition are different scopes; any temporary support, service isolation or reinstatement must be agreed in the proposal.

03What determines the price and start date?

The structure, removal quantities, retained areas, access, chosen method, lifting and waste arrangements shape the quotation. Authority and owner approvals, service isolation and an agreed work sequence affect the start date. Share the site location and documents for a project-specific review rather than relying on a generic price per square metre.

Project enquiries

Tell us what needs to go. And what must stay.

Request a scope reviewinfo@arasarinternational.aeDubai office and company information